2W系列木工真空吸附泵
博焱泵業(yè)專業(yè)生產(chǎn)CNC木工數(shù)控設(shè)備:水循環(huán)真空吸附泵/數(shù)控加工中心專用
設(shè)備配套專用2BVA型真空泵使用說明:
Carpentry engraving machine necessary special-purpose 2BVA series vacuum pump operating instructions
產(chǎn)品說明Explanation:該設(shè)備是在2BVA系列真空泵上加裝了循環(huán)水箱,止回閥及除塵罩,使用方法與2BVA系列真空泵的使用方法基本相同。
This equipment has installed the circulation water tank on the 2BVA series vacuum pump, the check valve and the dust removal cover, the application method and the 2BVA vacuum pump's application method basic same.
產(chǎn)品介紹:Product introduction:
1、 吸氣口Air inlet port:連接木工雕刻機(jī)吸附管道,外徑47mm;
Connects the carpentry engraving machine adsorption pipeline, outer diameter 47mm;
2、 (選配件) 除塵罩Removes dust the cover:防止木屑等雜物進(jìn)入泵內(nèi);
Prevents sundry goods and so on sawdust to enter in the pump;
3、 止回閥Check valve:停機(jī)時(shí),防止泵內(nèi)的水回流到設(shè)備內(nèi);
When engine off, prevents in pump's water backflow to the equipment in;
4、 進(jìn)水管Water inlet pipe:向泵內(nèi)注入工作液(水),設(shè)備產(chǎn)生真空;
Pours into the driving fluid to the pump in (water), equipment cavitation;
5、 進(jìn)水閥門Inlet valve gate:控制工作液的流量,開機(jī)之前必須完全打開閥門,并確保水已經(jīng)進(jìn)入泵內(nèi),才能啟動(dòng)真空泵;
Control driving fluid current capacity, before starting, must turn on the valve completely, and guaranteed that the water already entered in the pump, can start the vacuum pump;
6、 排水口Freeing port:在設(shè)備使用10天左右,排空水箱內(nèi)的工作液,更換干凈的軟化水;
In the equipment uses about 10 days, evacuates in water tank's driving fluid, replaces the clean softened water;
7、 排氣口Air vent:在吸附過程中產(chǎn)生的氣體,通過排氣口排入大氣,排氣口不可堵塞,不可接超過兩米的管路,不可接直徑低于5cm的管路,極易超負(fù)荷,損壞電動(dòng)機(jī);
Gas which produces in the adsorption process, disperses into the atmosphere through the air vent, the air vent cannot stop up, cannot meet surpasses two meters pipelines,Cannot meet the diameter to be lower than 5cm the pipeline,the extremely easy excess load, to damage the electric motor;
8、 上水位口On water level mouth:向水箱內(nèi)加水,直到上水位口向外淌水為止,并在每天啟動(dòng)真空泵前定時(shí)加水,保證水箱內(nèi)有充足的工作液。
Adds water to the water tank, drips water outward until on water level mouth, and before is starting the vacuum pump fixed time to add water every day, guaranteed that in the water tank has the sufficient driving fluid.
9、 水箱Water tank:盛放工作液。Puts the driving fluid abundantly.
10、 電動(dòng)機(jī)Electric motor:采用380V,三相電動(dòng)機(jī),接線時(shí)請注意旋轉(zhuǎn)方向。
Uses the 380V, three-phase motor, when the wiring please note the hand
推荐
-
-
QQ空间
-
新浪微博
-
人人网
-
豆瓣